{"id":5698,"date":"2026-09-09T17:21:18","date_gmt":"2026-09-09T17:21:18","guid":{"rendered":"https:\/\/www.realites-senegal.sn\/safietou-housing-project-in-yoff-with-the-structure-complete-construction-is-moving-upward\/"},"modified":"2026-09-17T19:15:58","modified_gmt":"2026-09-17T19:15:58","slug":"safietou-housing-project-in-yoff-with-the-structure-complete-construction-is-moving-upward","status":"publish","type":"post","link":"https:\/\/www.realites-senegal.sn\/en\/safietou-housing-project-in-yoff-with-the-structure-complete-construction-is-moving-upward\/","title":{"rendered":"Safi\u00e9tou Housing Project in Yoff: With the structure complete, construction is moving upward"},"content":{"rendered":"\n<p>The Safi\u00e9tou project, located in Yoff Biagui and rising six stories high, continues to take shape. In April 2026, the teams completed the ground floor and began construction on the first floor. Since then, progress has been steady; the structure is now complete, and the teams are working on the top floors. Take a look at how the project is coming along.   <br><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The structural work is complete<\/h2>\n\n\n\n<p>This decisive milestone marks the completion of the building&#8217;s structural framework. The columns, beams, and slabs are now in place on all levels. <\/p>\n\n\n\n<p>The basement was also lined. This waterproofing technique provides long-lasting protection for the underground levels and floors against water infiltration, which is essential for the structure\u2019s strength and durability. <\/p>\n\n\n\n<p>The construction project has thus moved on to the masonry and finishing phases.  <\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"5600\" data-src=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/peinture-mur-chantier-safietou-576x1024.png\" alt=\"A team painting the walls at the Safi\u00e9tou construction site\" class=\"wp-image-5600 lazyload\" data-srcset=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/peinture-mur-chantier-safietou-576x1024.png 576w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/peinture-mur-chantier-safietou-169x300.png 169w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/peinture-mur-chantier-safietou.png 1040w\" data-sizes=\"(max-width: 576px) 100vw, 576px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 576px; --smush-placeholder-aspect-ratio: 576\/1024;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"5601\" data-src=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/conductrice-travaux-realites-senegal-2-576x1024.png\" alt=\"REALITES SENEGAL construction site supervisor wearing a hard hat\" class=\"wp-image-5601 lazyload\" data-srcset=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/conductrice-travaux-realites-senegal-2-576x1024.png 576w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/conductrice-travaux-realites-senegal-2-169x300.png 169w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/conductrice-travaux-realites-senegal-2.png 1040w\" data-sizes=\"(max-width: 576px) 100vw, 576px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 576px; --smush-placeholder-aspect-ratio: 576\/1024;\" \/><\/figure>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Work on the top few floors is nearing completion, and finishing work will begin soon<\/h2>\n\n\n\n<p>Now that the structural work has been approved, the teams are focusing on the masonry for the last two floors of the building project. Work on the 5th and 6th floors\u2014which mark the top of the structure\u2014is underway, progressing steadily, floor by floor. <\/p>\n\n\n\n<p>At the same time, finishing work is beginning on the lower floors, a sign that several trades are now working simultaneously on the construction site:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Painting is underway on the 4th floor,<\/li>\n\n\n\n<li>The suspended ceiling is also being installed on the 4th floor,<\/li>\n\n\n\n<li>Work has begun on installing the waterproofing in the restrooms.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"5596\" data-src=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-chantier-safietou-septembre-2026-576x1024.png\" alt=\"Aerial view of the facade of the Safi\u00e9tou residence\" class=\"wp-image-5596 lazyload\" data-srcset=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-chantier-safietou-septembre-2026-576x1024.png 576w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-chantier-safietou-septembre-2026-169x300.png 169w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-chantier-safietou-septembre-2026.png 1040w\" data-sizes=\"(max-width: 576px) 100vw, 576px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 576px; --smush-placeholder-aspect-ratio: 576\/1024;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-style-default\"><img decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"5597\" data-src=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-drone-safietou-septembre-2026-576x1024.png\" alt=\"Overall aerial view of the Safi\u00e9tou residential complex currently under construction\" class=\"wp-image-5597 lazyload\" data-srcset=\"https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-drone-safietou-septembre-2026-576x1024.png 576w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-drone-safietou-septembre-2026-169x300.png 169w, https:\/\/www.realites-senegal.sn\/wp-content\/uploads\/2026\/09\/vue-drone-safietou-septembre-2026.png 1040w\" data-sizes=\"(max-width: 576px) 100vw, 576px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 576px; --smush-placeholder-aspect-ratio: 576\/1024;\" \/><\/figure>\n<\/figure>\n\n\n\n<p>Another notable milestone: the mechanical and electrical systems\u2014that is, the utility networks and installations built into the building (electrical, plumbing, etc.)\u2014are now 100% complete. This milestone paves the way for finishing work on all floors. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Upcoming steps for the coming weeks<\/h2>\n\n\n\n<p>Now that the technical specifications have been finalized, the construction site can move on to finishing work on all floors. The teams will therefore be focused on three tasks in the coming weeks: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The pursuit of waterproofing,<\/li>\n\n\n\n<li>Laying the tile,<\/li>\n\n\n\n<li>Installation of the aluminum window and door frames.<\/li>\n<\/ul>\n\n\n\n<p>Located in the <a href=\"https:\/\/www.realites-senegal.sn\/en\/advice\/investing-in-yoff-biagui-in-dakar-why-is-this-neighborhood-becoming-increasingly-popular\/\" target=\"_blank\" rel=\"noreferrer noopener\">Yoff Biagui neighborhood<\/a>, the Safi\u00e9tou development offers a highly desirable living environment that blends tradition with urban vibrancy. This is yet another asset for the project, which is moving closer to completion, step by step.<\/p>\n\n\n\n<p>For more information, please contact our sales department at +221 76 216 16 16.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Safi\u00e9tou project, located in Yoff Biagui and rising six stories high, continues to take shape. In April 2026, the teams completed the ground floor and began construction on the first floor. Since then, progress has been steady; the structure is now complete, and the teams are working on the top floors. Take a look [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":5699,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"Safi\u00e9tou Residence: Construction Is Rising Higher","_seopress_titles_desc":"Learn about the progress of construction on the Safi\u00e9tou project in Yoff Biagui. The construction site is moving on to finishing work and is completing the masonry on the 5th and 6th floors.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[109],"tags":[],"class_list":["post-5698","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-site"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/posts\/5698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/comments?post=5698"}],"version-history":[{"count":3,"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/posts\/5698\/revisions"}],"predecessor-version":[{"id":5819,"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/posts\/5698\/revisions\/5819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/media\/5699"}],"wp:attachment":[{"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/media?parent=5698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/categories?post=5698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.realites-senegal.sn\/en\/wp-json\/wp\/v2\/tags?post=5698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}